Concrete Column & Sonotube Calculator

Concrete needed for round columns, piers and tube forms (sonotubes). Uses cylinder volume, which differs from slab math.

Formula

Cubic feet = π × (diameter(in)/24)² × height(ft) × count; cubic yards = cu ft ÷ 27 × (1 + waste%).

Worked example

Inputs: Tube diameter = 12 in; Height = 4 ft; Number of columns = 4; Waste allowance = 10 %; Bag yield = 0.6 cu ft/bag.

Cubic yards0.51
Cubic meters0.39
Bags24

FAQ

How much concrete is in a 12 in × 4 ft tube?

π × 0.5² × 4 ≈ 3.14 cu ft, about 5.2 bags at 0.60 cu ft/bag before waste.